31.7 C
Ho Chi Minh City
Monday, December 23, 2024

Dong Nai approves VND2.6 trillion for Beltway 3

The Saigon Times

Must read

HCMC – The Dong Nai People’s Committee has approved a VND2.6 trillion budget for the Beltway No. 3 section that will pass through the province, according to the local media.

The Dong Nai section of Beltway No. 3 is over 11.2 kilometers long, with its starting point in Vinh Thanh Commune, Nhon Trach District, and the endpoint at Nhon Trach Bridge leading to Thu Duc City.

The project comprises a five-kilometer highway connecting with the Tan Van-Nhon Trach section, the roads along both sides of the expressway with a length of over 11.2 kilometers, and two bridges over the Rach Chay River.

The 76-kilometer Beltway No. 3 will pass through HCMC, Binh Duong, Dong Nai, and Long An. It is expected to create a major breakthrough in interprovincial traffic connectivity and promote socio-economic development in the southeast region.

The beltway will need a total of over VND75 trillion.

The project also includes intersections with the Ben Luc-Long Thanh Expressway and Provincial Road 25C. The whole project will be completed in 2026.

More articles

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Latest articles